{"id":205,"date":"2019-12-03T19:57:29","date_gmt":"2019-12-03T18:57:29","guid":{"rendered":"http:\/\/louthwatersproject.com\/?page_id=205"},"modified":"2019-12-04T14:48:28","modified_gmt":"2019-12-04T13:48:28","slug":"visit-to-river-vartry-and-east-wicklow-rivers-trust","status":"publish","type":"page","link":"http:\/\/louth.waters-project.com\/index.php\/visit-to-river-vartry-and-east-wicklow-rivers-trust\/","title":{"rendered":"Visit to River Vartry and East Wicklow Rivers Trust"},"content":{"rendered":"\n<p> Water Resources Management Training in Co. Louth<br> 30th November 2019<br> Yet another great day with participants from the Water Resources  Management Training course. Hosted by Luke Drea and the East Wicklow  Rivers Trust (<a rel=\"noreferrer noopener\" href=\"https:\/\/wicklowrivers.ie\" target=\"_blank\">https:\/\/wicklowrivers.ie<\/a>)  we learned about efforts to ensure maximum flow rates in the River  Vartry &#8211; a gem of a little sea trout river along our east coast. We also  heard in some detail about the formation of the Trust less than twelve  months ago and the fantastic progress that has been made by their  enthusiastic supporters in such a short space of time!<\/p>\n\n\n\n<p>Following a visit to the Vartry Reservoir where a new drinking water treatment plant is under construction, the group walked into the Devil&#8217;s Glen in hope of seeing some sea trout in the act of spawning. Unfortunately, while conditions were perfect, we did not see any sea trout. The Devil&#8217;s Glen Waterfall was, however,  in spectacular form with an unusually high flow rate following recent rain.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" width=\"1024\" height=\"768\" src=\"http:\/\/louthwatersproject.com\/wp-content\/uploads\/IMG_20191130_122159-1024x768.jpg\" alt=\"\" class=\"wp-image-226\" srcset=\"http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_122159-1024x768.jpg 1024w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_122159-300x225.jpg 300w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_122159-768x576.jpg 768w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_122159-1568x1176.jpg 1568w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_122159.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>Luke Drey described the setting up of the East Wicklow&#8217;s Rivers Trust to the group before heading out into the field.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" width=\"1024\" height=\"768\" src=\"http:\/\/louthwatersproject.com\/wp-content\/uploads\/IMG_20191130_142701-1024x768.jpg\" alt=\"At the Vartry Reservoir Dam overlooking the water treatment plant that provides drinking water for large parts of South Dublin and Wicklow. A new plant is under construction.\" class=\"wp-image-218\" srcset=\"http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_142701-1024x768.jpg 1024w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_142701-300x225.jpg 300w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_142701-768x576.jpg 768w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_142701-1568x1176.jpg 1568w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_142701.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>At the Vartry Reservoir Dam overlooking the water treatment plant that provides drinking water for large parts of South Dublin and Wicklow. A new plant is under construction.<br><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" width=\"1024\" height=\"768\" src=\"http:\/\/louthwatersproject.com\/wp-content\/uploads\/IMG_20191130_142456-1-1024x768.jpg\" alt=\"\" class=\"wp-image-220\" srcset=\"http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_142456-1-1024x768.jpg 1024w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_142456-1-300x225.jpg 300w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_142456-1-768x576.jpg 768w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_142456-1-1568x1176.jpg 1568w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_142456-1.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>A view of the water treatment plant sand filters &#8211; to be replaced by a new plant in 2021.<br><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" width=\"1024\" height=\"768\" src=\"http:\/\/louthwatersproject.com\/wp-content\/uploads\/image00003-1-1024x768.jpeg\" alt=\"\" class=\"wp-image-212\" srcset=\"http:\/\/louth.waters-project.com\/wp-content\/uploads\/image00003-1-1024x768.jpeg 1024w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/image00003-1-300x225.jpeg 300w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/image00003-1-768x576.jpeg 768w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/image00003-1-1568x1176.jpeg 1568w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/image00003-1.jpeg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>Following recent rainfall the reservoir overflows into the Vartry River, bypassing the treatment plant. In dry weather a compensation flow of 5 million litres per day is proposed.<br><br><br><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" width=\"1024\" height=\"768\" src=\"http:\/\/louthwatersproject.com\/wp-content\/uploads\/image00011-1024x768.jpeg\" alt=\"\" class=\"wp-image-208\" srcset=\"http:\/\/louth.waters-project.com\/wp-content\/uploads\/image00011-1024x768.jpeg 1024w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/image00011-300x225.jpeg 300w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/image00011-768x576.jpeg 768w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/image00011-1568x1176.jpeg 1568w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/image00011.jpeg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>Ken showed us likely sea trout spawning spots.<br><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" width=\"1024\" height=\"768\" src=\"http:\/\/louthwatersproject.com\/wp-content\/uploads\/IMG_20191130_160719-EFFECTS-1024x768.jpg\" alt=\"\" class=\"wp-image-232\" srcset=\"http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_160719-EFFECTS-1024x768.jpg 1024w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_160719-EFFECTS-300x225.jpg 300w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_160719-EFFECTS-768x576.jpg 768w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_160719-EFFECTS-1568x1176.jpg 1568w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/IMG_20191130_160719-EFFECTS.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>Enjoying the Vartry River in the Devil&#8217;s Glen<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" width=\"1024\" height=\"768\" src=\"http:\/\/louthwatersproject.com\/wp-content\/uploads\/EFFECTS-1024x768.jpg\" alt=\"\" class=\"wp-image-225\" srcset=\"http:\/\/louth.waters-project.com\/wp-content\/uploads\/EFFECTS-1024x768.jpg 1024w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/EFFECTS-300x225.jpg 300w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/EFFECTS-768x576.jpg 768w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/EFFECTS-1568x1176.jpg 1568w, http:\/\/louth.waters-project.com\/wp-content\/uploads\/EFFECTS.jpg 2000w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption>The Devil&#8217;s Glen Waterfall was in full flow.<br><br><\/figcaption><\/figure>\n\n\n\n<p><br> Can&#8217;t wait for next Saturday (7th December), when we hold a small  streams assessment demonstration on the River Glyde at Castlebellingham &#8211;  all are welcome (10.00 to 13.00)! <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Water Resources Management Training in Co. Louth 30th November 2019 Yet another great day with participants from the Water Resources Management Training course. Hosted by Luke Drea and the East Wicklow Rivers Trust (https:\/\/wicklowrivers.ie) we learned about efforts to ensure maximum flow rates in the River Vartry &#8211; a gem of a little sea trout [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"http:\/\/louth.waters-project.com\/index.php\/wp-json\/wp\/v2\/pages\/205"}],"collection":[{"href":"http:\/\/louth.waters-project.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/louth.waters-project.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/louth.waters-project.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/louth.waters-project.com\/index.php\/wp-json\/wp\/v2\/comments?post=205"}],"version-history":[{"count":10,"href":"http:\/\/louth.waters-project.com\/index.php\/wp-json\/wp\/v2\/pages\/205\/revisions"}],"predecessor-version":[{"id":233,"href":"http:\/\/louth.waters-project.com\/index.php\/wp-json\/wp\/v2\/pages\/205\/revisions\/233"}],"wp:attachment":[{"href":"http:\/\/louth.waters-project.com\/index.php\/wp-json\/wp\/v2\/media?parent=205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}